Final Check list:
1. draw grid:
1A. grid means material-
In plan: material lines of pavement/ plaza. You can also have material-pavement lines on interior public spaces.
1B. grid in elevation- material joints that works with proportion of structure and indicates a material idea.
2. draw poche:
Poche of underground plan
Poche of structure
3. Structure:
Show beam depth in section.
4. Diagrams:
Concept diagram
Program Diagram
Structure Diagram
Circulation Diagram
Event Diagram
Envelope Diagram—I added this
5. Large scale drawing or model:
1/8” special piece with scale person.
See portfolio samples, click and wait, click and click on d1 etc, it is slow so be patient
No comments:
Post a Comment